Inspection Guidance

The entire process of acceptance for the internal components of the reactor supplied by Nippon Steel Corporation

  • Inspection Guidance

Inspection of pre-assembled cylinder dimensions
 

  • Inspection Guidance
    Bottom distribution plate pre-assembly and levelness inspection
  • Inspection Guidance
    Pre-assembly of the bottom sieve plate
  • Inspection Guidance
    Cold hydrogen tank and support beam pre-assembly
  • Inspection Guidance
    Pre-assembly of the jetting disc
  • Inspection Guidance
    Cold hydrogen disk pre-assembly
  • Inspection Guidance
    Pre-assembly of cold hydrogen distribution tubes
  • Inspection Guidance
    Pre-assembly of catalyst support disc
  • Inspection Guidance
     
  • Inspection Guidance
    Water filling Inspection Guidancetest for leak detection of the distribution plate

  • Cold hydrogen Inspection Guidancedisk water tightness test

  • Distribution unit PT detection
  • Inspection Guidance
    Support for PT testing by Liang

 

Foreign manufacturers came to our company for guidance.

  • Inspection Guidance
    Visitors from JSW (Japan Steel Works) arrived.
  • Inspection Guidance
     

Inspection Guidance
UOP Company's guests visited our company.

Inspection Guidance
Chevron Company's guests inspected the internal components of the reactor at our site.

Inspection GuidanceChevron Technology Distribution Disk

Inspection Guidance
Visitors from the Iranian National Oil Company arrive

Home

Home

About us

About us

Products

Products

Contact us

Contact us